Cal/Atlantic - Orlando Only
Materials: 9” protecto wrap , green branded raindrop
9” protectowrap Flashing tape on the block – 7 on the wood and 2 on concrete.
All wood needs to be covered including bottom of arches and porches.
wrap all door bucks
Champagne (round) cuts on the windows. . We do not flex the windows sills.
Remember to skip slit horizontal layers if needed.
All exterior knee walls are to be wrapped over the top with house wrap
Streamers must be placed at the top of the wall if one is needed. DO NOT PUT IT ON THE BOTTOM
The metal on the roof returns: the top part of the metal is covered with paper- the lower half the metal is exposed with housewrap under the metal.